You imagine it. We bring it to life.(301) 832-0409
Modern detached accessory dwelling unit built by Excell Homes in Northern Virginia

Turnkey ADU Builder · DC, Maryland & Northern Virginia

Your backyard could earn $2,000+/mo

A legal, income-producing backyard home, or an in-law suite steps from your door. We handle architectural design, all the permitting, and the complete build. One contract. One team.

20+Years building
2,500+Projects done
$2,184Median rent · Annandale
5–8 monthsDesign to move-in

100% turnkey

We design it, permit it, and build it.

An accessory dwelling unit is one of the highest-return improvements you can make to a home across the DC metro, added rental income and six figures of equity from a single build. We handle architectural design, every local permit, and the complete construction. You just turn the key.

Design · Permits · Build

The NoVA ADU reality

Three things that derail most ADU projects.

We built our process to remove each one.

The problem

The zoning maze

Setbacks, lot coverage, owner-occupancy rules, NoVA's ADU regulations differ by county and change often.

We've navigated Fairfax, Arlington, and Alexandria permitting offices for years.
The problem

Hidden costs

Surprise utility connections, impact fees, and change orders can blow up a budget mid-build.

Transparent, upfront pricing, the number we quote is the number you pay.
The problem

Juggling vendors

Architect, engineer, expediter, GC, inspectors, coordinating them all is a part-time job.

One team handles design, permits, and construction end to end.

Process

How long does it take to build an ADU?

Typical total: 5–8 months. One team, start to finish.

Phase 1

Custom ADU Design

2–4 weeks

We design an ADU tailored to your lot, goals, and budget, and prepare the drawings for permitting.

Phase 2

All NoVA Permits

1–3 months

We file and manage every permit and approval through your county or city, you don't chase a single office.

Phase 3

Build & Key Delivery

12–16 weeks

We build it turnkey and hand you the keys, ready to rent or move family in.

Design, permit, and build under one contract. We design an ADU around your lot and your goals, whether that is rental income or housing aging parents. We handle the zoning research and permitting, including Fairfax County zoning, and then we build it, so design, permitting, and construction stay with one team.

Planning ahead? See our ADU cost guide for Northern Virginia and our Fairfax County ADU zoning guide.

Cost & return

How much does an ADU cost, and what can it earn?

Illustrative 600 sq ft detached ADU in the Annandale / Fairfax area.

600 sq ft detached ADU · Annandale / Fairfax

A snapshot of typical economics, your numbers depend on lot, design, and finishes.

Build cost (600 sq ft)
$150K–$200K
Median rent (all unit sizes)
$2,184/mo
Annual rent at the median
$26,208
Home equity bump
+$100K–$175K
Break-even
5–7 years
20-year net
$280K–$380K+
Rent: Apartment List, Annandale rent report, October 2026, overall median for all apartment sizes, not a 2-bedroom figure; assumes ~3% annual rent growth. In Fairfax County, ADUs are for long-term rental (leases of 30 days or more); short-term lodging is not permitted. Illustrative only, not a guarantee.

Estimate your ADU

Ballpark your build cost and rental income.

Slide your ADU size and pick your area for a quick estimate. When you’re ready, answer 4 quick questions and our team will review your property and follow up.

Estimated build$157K–$191K
Area median rent (all sizes)$2,184/mo
Annual gross rent$26,208

Illustrative estimate only, not a quote or financing offer. Actual cost depends on design, site conditions, and finishes. Rent: Apartment List, Annandale rent report, October 2026, overall median for all apartment sizes, not an estimate for your unit.

Get your property reviewed →

Transparent pricing

No surprises, just the home you signed up for.

  • Transparent, upfront pricing, no surprise change orders.
  • Design, permits, materials, and build in a single contract.
  • A dedicated project manager from first drawing to final inspection.
  • Industry-leading warranty on labor and materials.

Prefer to pay over time? Financing is available →

Across the DC metro

We design and build ADUs in DC, Maryland, and Northern Virginia.

Regulations last verified: September 2026

We are headquartered in Gaithersburg, Maryland, and we build across the DC metro. Over 20+ years we have completed 2,500+ projects across Washington DC, Maryland, and Northern Virginia, including extensive remodeling work throughout Montgomery County. We design and build accessory dwelling units across all three, and we handle the zoning research and permitting for you.

One advantage worth knowing: in Maryland we handle design in-house, so drawings, permits, and construction stay under one roof and one contract. In Virginia and DC we work with a licensed architect partner for the design drawings, then manage permitting and construction the same way.

Montgomery County, Maryland

In unincorporated Montgomery County (Bethesda, Chevy Chase and more; the cities of Rockville and Gaithersburg set their own ADU rules), an ADU runs through two departments: a Class 3 Accessory Dwelling Unit license through DHCA, plus building permits through the Department of Permitting Services (DPS). Since October 5, 2026, an attached or detached ADU must be “not greater than 75% of the size of” the primary single-family detached dwelling unit. Under DHCA’s license rules, the ADU must be in the owner's primary residence, and every owner must show proof of residency; the zoning code allows one ADU per lot, with no more than two occupants aged 18 or older, and an ADU cannot be on a lot where a short-term residential rental exists or is licensed.

Fairfax County, Virginia

In Fairfax County, ADUs are officially Accessory Living Units (ALUs), permitted on single-family lots, one per property, capped at two bedrooms and two occupants, with owner-occupancy of either the home or the ALU. An interior or attached ALU is limited to 800 square feet or 40% of the principal dwelling's gross floor area, whichever is less, and can be approved by administrative permit; a detached ALU is 1,200 sq ft, permitted only on lots of at least two acres, and requires a special permit with a Board of Zoning Appeals public hearing. Properties on well or septic need Health Department approval first. The administrative permit fee is $285 application, $75 renewal, and the county estimates approximately 30 calendar days to process. Full details are in our Fairfax County ADU zoning guide.

Northern Virginia (Fairfax, Arlington, Alexandria) and Washington DC each have their own rules. For a full jurisdiction-by-jurisdiction breakdown, see our guide to ADU rules in DC, Maryland, and Virginia.

Free property review

Find out if your property qualifies.

Answer 4 quick questions. Our ADU team reviews your property and follows up with your options.

Step 1 of 5

What's your main goal for an ADU?

ADU FAQ

Questions homeowners ask us.

Can I build an ADU in Fairfax County, Arlington, or Alexandria?

In most cases, yes, each jurisdiction has its own rules on lot size, setbacks, and owner-occupancy. We assess your property up front and handle the zoning and permitting for you.

How much does an ADU cost to build in Northern Virginia?

A turnkey 600 sq ft detached ADU typically runs about $150K–$200K, depending on size, finishes, and site conditions. We give you a clear, upfront price before you commit.

How long does an ADU take from start to move-in?

About 5–8 months in total: 2–4 weeks of design, 1–3 months of permitting and review, 12–16 weeks of construction, then 1–2 weeks of final inspections.

How much rent can an ADU earn?

In Annandale the overall median rent, across all apartment sizes, is $2,184/mo, down 5.0% year over year (Apartment List, Annandale rent report, October 2026). The report does not break rent down by bedroom count, and what an ADU earns depends on its size, finish and location.

Are there rules on short-term rentals or owner-occupancy?

Short-term lodging, stays under 30 days like Airbnb, is not permitted in an ADU in Fairfax County, so an ADU is a long-term rental (leases of 30 days or more). Owner-occupancy rules also vary by jurisdiction. We walk you through what applies to your property during design.

Can I finance an ADU?

Yes. Through our RenoFi partnership you can finance your ADU based on your home's after-renovation value. See our financing page for details.

This guide is for general informational purposes only and does not constitute legal, zoning, or professional advice. Accessory dwelling unit rules vary by property, zone, and lot size, and they are actively changing. Several jurisdictions in the DC metro are currently reviewing or revising their ADU regulations, including Fairfax County. The information here reflects our understanding at the time of writing and may become outdated. Nothing here is a guarantee that a given project is permittable. Always confirm current requirements for your specific property directly with the relevant authority (the DC Office of Zoning and Department of Buildings, the Montgomery County Department of Housing and Community Affairs and Department of Permitting Services, or Fairfax County Planning and Development) before making decisions or beginning a project. Excell Homes is not responsible for actions taken based on this information.

Free · No obligation

Ready to unlock your backyard?

Tell us about your property and goals. We'll come back with a detailed ADU plan and upfront pricing.

Free estimateCall (301) 832-0409us